Note that it is not.
Valley board roof.
The grp valley manufacturers have good installation details with their product.
I still needed to cut back the old battens so that i could lay boards up the other side of the valley too.
Grp valley troughs provide you with a durable and cost effective alternative to lead products.
This is a lead valley.
Also will it matter that the 2 sides of valley are 25 mm diff heights.
The valley area of a roof the straight lines formed when two different planes of the roof meet is a critical area that handles a tremendous amount of water run off.
Section c cross section through alternative valley gutter detail to e2 as1.
Valley with valley tiles ensure that continuous support is provided for ends of tiling battens on each side of valley.
Other roof is standard so do i need to recess valley boards or can i use 6mm on top of rafters.
Looking for something specific.
Not around this week cant find any pictures diagrams in books or internet havent a clue really what this looks detailed.
Valley support boards laid up one side of the first valley.
Some grp valleys are sufficiently robust to enable them to be laid directly over the rafters rather than being supported on valley boards.
Cover valley with a strip of underlay not less than 600mm wide underlapping general underlay.
Existing room in roof ex tiled pitchedroof specified by struct eng.
On the left of the valley the board is cut between the rafters as they were existing and too shallo to notch out.
Cutting the boards at an angle to fit between the rafters was a bit of a pain.
We ve arranged our superb selection into grp valley troughs for tiled roofs and roof valley solutions for slate roofs.
Preformed grp valleys in many ways the roof construction for a pre formed grp valley is the same as that for a lead lined valley.
It is therefore worth asking the valley manufacturer for guidance on this.
Cut adjacent tiles and tile and a half tiles so that valley tiles course in and fit neatly.
Valleys are typically found where gable dormer roofs meet the main roof or when a house has angled wings or additions where two roof sections in different planes meet.
Soup to nuts riley shows the proper way of installing a valley on a roof.
The piece in the centre is the lay board that the right hand rafters are sitting on.
Fascia board cut down for valley gutter overhang corrugated metal roofing 80 mm overhang to valley gutter 20 mm minimum valley gutter upstand 50 mm minimum depth of valley gutter spouting 250 mm minimum overall valley gutter width 20 mm cut out to fascia valley rafter.
On the right the rafters are notched to take the valey board.